透明玻璃钢瓦制作方法
1、手糊工艺①配方:(191#树脂100份;过氧化环已酮4份或甲乙酮2份,环烷酸钴溶液l~4份,色浆适量。②制作方法:将聚酯薄膜裁成2.1米长、宽约1.1米的操作平台上,铺放一层聚酯薄膜,在薄膜上铺好1层方格布,再在方格布上铺1层方格布,再在上面铺簿膜再铺2层方格布在铺薄膜。如此重复铺放许多层,当铺好后再进行手糊操作生产,用塘瓷把缸从塘瓷桶中取出配好的胶料倒在铺好的最上层方格布上,用一个大刮板将树脂迅速均匀展开,另取1张聚酯薄膜盖在上面。换一个小刮板在聚酯薄上面刮除夹在方格布中的气泡。当方格布全部被树脂液浸渍,气泡全部赶除后,将夹有方格布的上层薄膜一起,移放在一波型金属模具上或其它材质的波型正模具上,待固化即成一张绿色玻璃钢波纹瓦板,再重复上述操作即能得到若干张玻型瓦,每一模具瓦可叠放许多层新做的瓦,然后锯边修整即可出售。2、拉挤工艺玻璃钢注意事项玻璃钢采光瓦安装注意要点:铺设完毕以后,预留出采光板的位置,施工由檐口逐步往屋脊方向进行。采光板直接扣在钢板的侧波峰上。采光瓦在固定前先导孔,孔径必须大于固定螺丝直径的6-9mm,以作为热胀冷缩之用。采光瓦与钢板在纵向搭接时,最小必须有200mm的重叠,并贴置两条止水带。采光瓦固定时,必须使用良好的泛水垫圈,使之介于螺丝与采光板之间,以便于防水防尘。将泛水垫圈套入螺丝内以后,用电钻锁入檩条内,即完成采光板的固定工作。采光瓦施工时,严禁脚直接踩在波峰上,以免采光板开裂。必须在采光板的横向位置,放置一块1200mmx300mm{长x
宽)防滑厚木板,脚踩在其上进行采光板的导孔和固定螺丝工作。
1. Hand paste technology: formula (191# resin 100, peroxide 4 or methyl
ethyl ketone 2, cobalt naphthenate L ~ 4, color paste). (2) making
method: put polyester film into 2.1 meters long and 1.1 meters wide
operating platform, lay a layer of polyester film on the film, spread 1
layers of square cloth on the film, then spread 1 layers of square cloth
on the square, and then lay a thin film on the top of the sheet, and
then spread 2 layers of square cloth to spread the film. In this way, a
lot of layers are laid, and then the hand batter is made after the
pawnshop is ready, and the pelnet porcelain is taken from the pond to
the top of the upper layer, and the resin is evenly spread out with a
large scraper, and 1 polyester films are covered on the top. Change a
small scraper to scrape the bubbles in the grid cloth on the polyester
thin top. When all the box cloth is impregnated with resin liquid, after
all the bubbles are removed, the upper layer film with square lattice
is put together to be placed on a wave type metal mold or other material
in a wave type positive die, and a green fiberglass corrugated plate is
made to be cured. Again, a number of glass tiles and every die tile can
be obtained by repeating the above operation. Many layers of newly made
tiles can be stacked and then trimmed for sale. 2, pultrusion process
glass fiber reinforced glass fiber reinforced glass steel lighting tile
installation attention points: after the paving, keep the position of
the lighting plate, construction from the cornice to the ridge
direction. The lighting plate is directly buckled on the side wave peak
of the steel plate. The front hole of the lighting tile is fixed, and
the aperture must be larger than 6-9mm of the fixed screw diameter, so
that it can be used as thermal expansion and cold contraction. When the
light tile is longitudinally lapped with the steel plate, the 200mm
overlap must be minimum and two water stop zones are attached. When
lighting tile is fixed, a good water washer should be used to make it
between the screw and the lighting panel, so that it is waterproof and
dust-proof. After the water flooding washer is inserted into the screw,
the electric drill is locked into the purlin to complete the fixing work
of the lighting panel. During the construction of lighting tiles, feet
are not allowed to step on the crest directly, so as to avoid cracking
of lighting boards. A 1200mmx300mm{long x wide wood board must be placed
in the horizontal position of the lighting plate, and the foot must be
carried on the guide hole and fixed screw for the lighting plate.