玻璃钢采光瓦安装要点
玻璃钢采光瓦安装要点
Installation points of FRP lighting tile
· 铺设完毕以后,预留出采光板的位置,施工由檐口逐步往屋脊方向进行。采光板直接扣在钢板的侧波峰上。
After laying, the location of the lighting panel is reserved, and the construction will proceed gradually from the cornice to the ridge. The lighting board is directly buckled on the side peak of the steel plate.
· 采光瓦在固定前先导孔,孔径必须大于固定螺丝直径的6-9mm,以作为热胀冷缩之用。
The leading hole of the shining tile before fixing must be 6-9mm larger than the diameter of the fixing screw to be used for thermal expansion and cold contraction.
· 采光瓦与钢板在纵向搭接时,最小必须有200mm的重叠,并贴置两条止水带。
When the shining tile and steel plate overlap lengthwise, the minimum overlap must be 200 mm, and two water stops must be attached.
· 采光瓦固定时,必须使用良好的泛水垫圈,使之介于螺丝与采光板之间,以便于防水防尘。
When fixing the shingles, a good flooding washer must be used between the screws and the shingles so as to prevent water and dust.
· 将泛水垫圈套入螺丝内以后,用铜钟 一次性止血带 标志桩模具 钢丝轮 流水槽模具 防撞墙模具 检查井钢模具 不锈钢铸件 模锻件电钻锁入檩条内,即完成采光板的固定工作。
After the flooding washer is inserted into the screw, the electric drill is locked into the purlin to fix the lighting plate.
· 采光瓦施工时,严禁脚直接踩在波峰上,以免采光板开裂。必须在采光板的横向位置,放置一块1200mmx300mm{长x 宽)防滑厚木板,脚踩在其上进行采光板的导孔和固定螺丝工作。
When the lighting tile is constructed, the foot should not be stepped on the crest directly, so as to avoid the cracking of the lighting panel. A 1200mm x 300mm {length x width} non-skid plank must be placed in the lateral position of the daylighting board, and the guide hole and fixing screw of the daylighting board must be stepped on it.